smart-electrical-db-poc-project-1

Smart DB POC

Singapore is engineering its transformation into a Smart Nation – byte by byte, system by system. These Strategic National Projects are the foundation for turning this vision into reality.

Punggol Smart Town

Bringing together residents, businesses and students, Punggol is slated to become a thriving, tech-enabled, sustainable town showcasing our Smart Nation ambitions.

Singapore’s highly-anticipated “smart district” that brings together industry and academia with the wider community to foster a vibrant, strong digital community! A thriving community of people will also be calling this neighbourhood home. With shared public spaces and hi-tech community facilities, PDD will be connected to the Punggol waterfront by green links for the community’s recreational needs.

Such Smart HDB is going to be equipped with the below features

1. accuracy of the measurement sensors/devices
a) Current (A) : ± 0.5%
b) Voltage (V) : ± 0.5%
c) Power Factor : ± 1%
d) Frequency (Hz) : ± 1%
e) Active Power (kW) : ± 1%
f) Reactive Power (kVAr) : ± 1%
g) Apparent Power (kVA) : ± 1%
h) Active Energy (kWh) : ± 1%

2. able to measure the following parameters:
a) Current (A)
b) Voltage (V)
c) Power Factor
d) Frequency (Hz)
e) Harmonics
f) Active Power (kW)
g) Reactive Power (kVAr)
h) Apparent Power (kVA)
i) Active Energy (kWh)


3. IEC 61439 compliance
4. Standard CP 5
5. All communication frequencies and protocols employed by the Gateway Unit shall be permitted by and adhere to the maximum field strength outputs within IMDA’s Technical Specification for Short Range Devices (IMDA TS SRD)

6. Min spec for SoC Processor – gateway unit – What ISA using – RISC or CISC  (intel or ARM ), how much bit
cache memory – ** L3 is not required to meet minimum cache requirements. The Contractor are highly recommended to consider microprocessor solutions with L3 cache

7. Supported Variants MODBUS, Fieldbus, Profibus, CAN  Protocol Serial (RTU), TCPPhysical Interface Serial (4-wire SPI bus), R

8. Gateway unit iec compliance – IEC 60950

9. The Gateway Unit shall be able to store at least 1 year of data on local storage.

10. 73.60.2.4.4 All data in transit (between the Gateway Unit and Backend Cloud Server(s)) shall be encrypted to the minimum specified depth and above: 
• 256-bit for AES Rjindael or equivalent symmetric key method(s)
• 384-bit for Elliptical Curve Cryptography (ECC) or equivalent asymmetric method(s)
Security Bit
192 AES-192 SHA-384 384
256 AES-256 SHA-512 512

11. The HEMS cater for over the air (OTA)

12.  Wifi internet facing AP compliance
WPA2-PSK (AES) Yes
WPA-PSK (AES) Yes

13. RSSO all data transmission AES or ECC
128 AES-128 SHA-256 256
192 AES-192 SHA-384 384
256 AES-256 SHA-512 512

14. All APIs implemented on products and servers within the HEMS

15. All data transmission methods (e.g. MQTT, RESTful Web Services) utilized in HEMS is implemented with TLS (v1.2 and above) 

16. The accuracy of the NILM
Accuracy of Identification – Measurement of the accuracy of identification of the connected
load e.g. Electric Kettle, Air-con, Electric Fan, Television, Vacuum Cleaner etc.  – >= 70%

Detection of connected load – Measurement of the response time to detect the connected load
within 5 min for ≥50 Watt load. – Time taken – >= 80%

17. Access levels
Administrators
• Master User (per household)
• Sub User(s) (per household)
All user types is protected by a minimum of 2-Factor Authentication
(2FA) for account access.

18.  CREST-certified thirdparty testing body to carry out a Vulnerability and Penetration Test (VAPT) on the proposed HEMS. The Contractor shall rectify all critical loopholes identified by the VAPT
Multi-Tier Cloud Security Standard (MTCS SS584) Level 3

19. Device management platform (DMP)

20. A Full Power Packed System for SMART NATION Singapore`s SMART DB Project

Challenge

The CEO of Delaware, William Rogerson, made it clear to SEO Inc. that his goals were to:

  • Increase organic traffic 5% per month
  • Increase the number of keywords on the first two pages of Google results.
  • Increase appointments in both the US and UK
  • Increase franchisee applications

Solution

Explain to you how all this mistaken idea of denouncing pleasure and praising system.

  • Increase organic traffic 5% per month
  • Increase the number of keywords on the first two pages of Google results.
  • Increase appointments in both the US and UK
  • Increase franchisee applications

The Results

The great explorer of the truth, the master-builder human happiness one rejects, dislikes, or avoids pleasure ut explain to you how all this mistaken idea of denouncing pleasure and praising pain was born and will give you a complete account of the system.

Expound the actually teachings of the great explorer of the truth, the master builder of no one rejects.

Growth Statistics